January 21st 2005
Temperature 42o F
Wind s.w. 20 mph


Today not much new happened but it was warm enough for Dan to get out of his truck and get a close up look at the construction site.

 

Water line moving north past the building.

 

 

 

 

 

 

 

More steel bracing.

 

Back door by the garage was installed. Dan noteced that the door was locked.

 

 

Dan out on the job site.

 

Inspecting the building.